Projects
This section showcases a selection of projects that highlight my expertise in engineering and process optimization.
Process Simulation for Lean Manufacturing
System Engineer
-
Objective: Address bottlenecks between Acid and Wire Drawing Processes and optimize system efficiency.
-
Analysis: Conducted simulation with Acid Processes operating on 3 shifts and Wire Drawing Processes on 2 shifts.
-
Findings: Identified low utilization of 12 Wire Drawing machines and a bottleneck between Acid and Wire Drawing Processes.
-
Solution: Implemented an optimized shift schedule for both processes to maximize production
-
Outcomes: Enhanced machine utilization, eliminated bottlenecks, reduced costs by 5%, and increased production by 8% while minimizing total input time for Wire Rods.

3D Bin Packing Optimization using Mathematical Modelling
Competitor
-
Objective: Maximize truck fill rates through efficient 3D bin packing.
-
Analysis: Conducted a literature review on existing 3D bin packing algorithms and developed a new algorithm by refining current methods to enhance fill rates.
-
Findings: Existing heuristic approach led to low fill rates due to inefficiencies in the bin packing process.
-
Solution: Designed and implemented a 3D bin packing optimization solution.
-
Outcome: Achieved 11% increase in truck fill rates, enhancing overall operational efficiency.



Traffic Flow Optimization
Developer
Coming soon...